|
Product Detail :
|
The project involves the construction of a 1.80-meter-wide foot over bridge (FOB) to prevent unauthorized access at specified railway locations. This includes the supply and installation of high-strength zinc-coated steel decking for durability and corrosion resistance, as well as the necessary formwork and structural supports. Additional tasks include earthwork, hiring of machinery for site preparation, and the installation of protective screens and other related structures. FOB construction, steel decking, formwork, JCB machine hire, protective screens
|
| Tender Detail : |
The project involves the construction of a 1.80-meter-wide foot over bridge (FOB) to prevent unauthorized access at specified railway locations. This includes the supply and installation of high-strength zinc-coated steel decking for durability and corrosion resistance, as well as the necessary formwork and structural supports. Additional tasks include earthwork, hiring of machinery for site preparation, and the installation of protective screens and other related structures. |